If you are installing rooftop solar in Indore, there is one step you cannot skip: net metering with MPPKVVCL, the city's electricity company. Net metering is what lets your extra solar power flow back to the grid and turn into savings on your bill. Without it, that extra power is simply wasted.
This guide walks you through the exact 2026 process, the documents you need, the fees, and how long each stage takes. It is written in simple steps, so even if this is all new to you, you will know exactly what to expect.
What Is MPPKVVCL and Net Metering in Indore?
MPPKVVCL stands for Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited. It is the government electricity distribution company DISCOM for Indore and western Madhya Pradesh, covering nearby areas like Ujjain, Dewas, Ratlam, and Pithampur.
You may also see it written as MPWZ or hear people call it "MPEB."
Solar net metering is a billing system. A special two-way (bidirectional) meter counts two things:
- The units your solar system sends to the grid
- The units you draw from the grid
At the end of the month, you are billed only for the "net" difference.
In short, the grid acts like a free battery, storing your extra daytime power as credits that you use up at night.
Net Metering Eligibility and Rules in Indore (MPERC RG-39, 2026)
Net metering in Indore follows the rules set by the Madhya Pradesh Electricity Regulatory Commission (MPERC) under its RG-39 regulation.
Here is what applies to you:
- Who can apply: Residential, commercial, and institutional consumers of MPPKVVCL can all apply.
- System size: You can install up to 500 kW, but your system size must stay within your sanctioned load or contract demand.
- Approved equipment: Your panels must be ALMM-listed and Made in India (DCR), and your inverter must be MNRE-approved.
- Credits: Extra units are credited at the retail tariff and carried forward month to month. Any surplus left at year-end is settled at the rate fixed by MPERC.
Good to know: Many first-time buyers do not realise that your solar size cannot be bigger than your sanctioned load. For example, if your sanctioned load is only 2 kW but you want a 3 kW system, you must first apply to upgrade your load. Getting this right early saves you from delays later.
Documents Required for MPPKVVCL Net Metering
Keeping your papers ready makes the whole process faster. The documents come in two stages.
At the Time of Application
- Your latest MPPKVVCL electricity bill, less than 3 months old
- Consumer ID or account number, printed on your bill
- Aadhaar card as ID proof
- PAN card, needed for larger or subsidy-linked systems
- Property ownership proof, such as registry or property tax receipt
- One passport-size photo
- Single Line Diagram (SLD) signed by a licensed engineer
- Solar panel and inverter datasheets to prove they are approved
- Sanctioned load details
After the System Is Installed
- Photos of the installed panels, inverter, and earthing pit
- Panel and inverter serial numbers
- Structure load-bearing certificate
- Commissioning or electrical safety report
MPPKVVCL Net Metering Process in Indore Step by Step
The process is a clear, fixed set of steps. Here is how it works in 2026:
Step 1: Apply Online
Register on the PM Surya Ghar National Portal, select Madhya Pradesh and MPPKVVCL, and fill in the rooftop solar form with your details, consumer number, and the system size you want.
MPPKVVCL also has its own rooftop portal for applications.
Step 2: Feasibility Check
MPPKVVCL reviews your application and checks if your local grid can take the system.
Once it approves, it issues a technical feasibility approval, often called TFR, online.
Step 3: Install the System
After feasibility approval, an empanelled vendor handles the solar panel installation process in Indore using ALMM-listed panels.
The vendor then uploads your:
- Installation photos
- Panel serial numbers
- Inverter serial numbers
- Invoice
Step 4: Inspection and Meter Fitting
An MPPKVVCL official inspects your setup and installs and tests the bidirectional net meter.
Step 5: Agreement and Go-Live
You sign the net-metering agreement, and your system is officially connected to the grid.
Your meter now counts both import and export.
Important: Always get feasibility approval before you install. Some people install first to save time, but if the grid check later flags a problem, the file goes back to the start and you lose weeks.
This is the part that feels confusing to many homeowners, and that is where Sunheaven steps in.
From preparing your SLD and filing the online application to following up on feasibility, managing the installation, and getting the net meter fitted, Sunheaven's end-to-end solar services cover the full MPPKVVCL process for Indore homes.
You get connected and start saving, without running from office to office.
MPPKVVCL Net Metering Timeline Stage by Stage
So how long does it take?
When your documents are complete, the full process in Indore usually takes about 30 to 45 days.
Here is a rough stage-wise view:
| Stage | What Happens | Time (Approx.) |
|---|---|---|
| Application & feasibility | Apply online, MPPKVVCL grid check and approval | 7 to 15 days |
| Installation | Vendor installs the system after approval | 2 to 5 days |
| Inspection & meter fitting | Site inspection and net meter installation | 7 to 15 days |
| Agreement & go-live | Net-metering agreement signed, system live | A few days |
Good to know: For home systems up to 10 kW under the PM Surya Ghar scheme, feasibility approval is treated as automatic, which speeds things up. Big cities like Indore also tend to process faster than smaller towns.
Fees and Net Meter Cost in Indore
There is no single fixed price here.
You usually pay:
- A small application or processing fee
- A one-time cost for the net meter itself
The meter cost depends on whether your connection is:
- Single-phase: Usually used by smaller homes
- Three-phase: Usually used by larger homes and generally costs more
Because these charges are revised from time to time, it is best to confirm the exact current amount with MPPKVVCL or your installer before you start.
Net Metering With the PM Surya Ghar Subsidy in Indore
Here is something worth knowing: net metering and the government subsidy go hand in hand.
The solar panel subsidy in Madhya Pradesh runs through the PM Surya Ghar scheme, and to claim the central subsidy of up to ₹78,000, you must have an approved MPPKVVCL net-metering connection.
The subsidy is available on systems up to 10 kW, and it lands directly in your bank account, usually within about 30 days of your meter being installed and approved.
The good news for Indore is the sunshine.
The city sits on the Malwa plateau and gets around 5.2 to 5.5 peak sun hours a day, which is among the best in central India.
More sunlight means more units generated, which keeps the overall solar cost in Indore low and brings the payback period to just about 3 to 5 years for a typical home system.
Conclusion
Net metering is the final step that makes your Indore rooftop solar system truly pay off.
It turns every extra unit into a credit on your bill, and the MPPKVVCL process is straightforward once your documents are in order and you follow the steps in the right sequence.
Ready to go solar in Indore without the paperwork stress?
Get a free quote from Sunheaven today and let our team handle the full MPPKVVCL net-metering and PM Surya Ghar subsidy process for you, from the first form to the final meter.
Frequently Asked Questions (FAQs)
Q1. How long does MPPKVVCL net metering take in Indore?
When your documents are ready, it usually takes about 30 to 45 days from application to a live connection.
Home systems up to 10 kW under PM Surya Ghar get faster feasibility approval, and Indore generally processes quicker than smaller towns.
Q2. Can I apply for net metering myself, or do I need an installer?
You can apply yourself on the PM Surya Ghar National Portal or the MPPKVVCL portal.
But because the process needs a proper SLD, feasibility follow-up, and a registered vendor for installation, most people let their solar company handle it end to end to avoid rejections and delays.
Q3. What is the maximum solar system size allowed under MPPKVVCL?
Under MPERC rules, you can install up to 500 kW, but your system size must not be more than your sanctioned load.
Most homes install between 2 kW and 5 kW based on their bill and roof space, and the 3 kW solar panel price in Indore with subsidy makes it the most popular starting point.
Q4. How much does the net meter cost in Indore?
You pay a small application fee plus a one-time net meter cost.
The amount depends on whether your connection is single-phase or three-phase, so it is best to confirm the current charge with MPPKVVCL or your installer.
Q5. Do I need net metering to get the PM Surya Ghar subsidy in Indore?
Yes.
An approved MPPKVVCL net-metering connection is required to claim the central subsidy of up to ₹78,000.
The two processes are linked and usually done together.
Q6. What happens to my extra units at the end of the month?
If you export more than you use, the extra units are credited and carried forward to your next bill.
Any surplus left at the end of the year is settled at the rate fixed by MPERC.